The UK’s copper analogue phone network, the Public Switched Telephone Network (PSTN), is due to close on 31 January 2027. If your phones, broadband, alarms or lift emergency lines still rely on an analogue line, they need to move to a digital service before then.
What is the PSTN switch-off?
It’s the replacement of the UK’s century-old analogue phone network with digital services that run over the internet. In 2017 it was announced that the UK would move to a fully digital network by the end of 2025. In May 2024 Openreach moved the deadline to 31 January 2027, and in 2026 it said there would be no further extension.
Digital networks offer more capacity, higher speeds and a wider range of flexible features than the old network.
What do you need to check?
Your phone system
Your phones are the most obvious service affected. To keep making and receiving calls, you need a digital phone system that carries calls over the internet, known as a cloud IP phone system or VoIP (voice over internet protocol).
Your broadband
Many broadband connections still use the phone line. ADSL broadband and fibre-to-the-cabinet (FTTC) broadband, which mixes fibre and copper, both depend on the legacy phone service. If you’re using either, switch to SoGEA (single order generic Ethernet access), which doesn’t need a phone line, or to full fibre (FTTP) where it’s available.
Alarm systems
Most alarm systems in the UK use a phone line to contact the monitoring company. If yours does, move it to an internet-based service to avoid losing your security cover.
Lift emergency phones
If your building has lifts, their emergency (SOS) phones are probably connected to a phone line. These also need to move to a digital connection to keep working.
What happens if you don’t go digital?
Services that rely on the analogue network will stop working. An analogue phone line will no longer make or receive calls, and broadband that isn’t SoGEA or full fibre will need to be replaced.
Openreach has announced a temporary emergency fallback for some lines that haven’t moved by the deadline, from 1 February 2027, but it’s a short-term safety net with extra cost, not a reason to wait. The safest plan is to move your services well before 31 January 2027.
Let us get you ready
We will check which of your services rely on the old network and recommend the digital option that fits your organisation, from a cloud phone system to switch-off-ready broadband. Book a meeting or call 01684 215 165.
